Kenya is a major East African road-building market and a transit hub for inland neighbours. We supply contractors — including Chinese project teams working in Kenya — with CIF Mombasa quotations.
Delivery Ports
- Mombasa
Sailing time: Approx. 20–30 days from China to Mombasa (reference only).
Commonly Specified Grades
60/70 is the standard grade for Kenyan road works; 80/100 and 40/50 are used where specified.
Bitumen 60/70
The most widely traded penetration grade for road construction in warm and temperate climates.
Bitumen 80/100
A softer penetration grade suited to cooler climates and lower-traffic roads.
Bitumen 40/50
A hard penetration grade for hot climates, heavy traffic and high-modulus mixes.
AH-70 / China Grade 70
Chinese-standard Grade 70 road petroleum asphalt for buyers and contractors working to Chinese specifications.
Polymer-Modified Bitumen (SBS)
SBS-modified binder for rutting resistance, elasticity and longer pavement life on demanding pavements.
Bitumen Emulsion
Cationic emulsions for tack coats, prime coats and surface treatments — no heating needed on site.
Recommended Packing
All four packings are workable via Mombasa; drums and framed jumbo bags are most common for inland project delivery.
All shipments in 20ft containers. Compare packings in our packing guide.