Bitumen arrives solid in drums and bags. Getting it from solid to sprayable without damaging the binder — or endangering the crew — is a matter of the right equipment and temperature discipline.

Drummed bitumen

Use a drum decanter or drum heater designed for bitumen: drums are heated in a chamber and tipped into a melting tank. Never apply open flame directly to drums, and never heat a sealed drum — pressure build-up can rupture it. Decant into a tank with controlled heating and circulation.

Bagged bitumen

Framed jumbo bags are designed for a bag-melting unit: the bag (with its meltable inner liner) is lifted into the melter, and the frame is removed as the block melts down. Keep melters fed steadily rather than overloading, which creates cold lumps and long melt times.

Temperature discipline

Work within the temperature guidance for your grade and mix design. As general practice: store and melt at the lowest temperature that keeps the binder workable, avoid prolonged holding at maximum temperature (which ages and hardens the binder), and never exceed the flash-point safety margin — keep heating media and hot-oil systems well maintained. Typical mixing temperatures for penetration grades sit roughly in the 140–165°C band depending on grade and mix; your mix design governs.

Common mistakes

Questions about your specific setup? Send us a photo of your melting equipment with your inquiry and we will advise on packing and procedure.

Need bitumen for your project?

Tell us your grade, packing and destination port — quoted within 24 hours on working days.

Request a Quote WhatsApp Us

More Guides

Bitumen Grades Compared: Pen vs VG vs PG

How penetration grades, viscosity grades (VG) and performance grades (PG) relate — and how to order the right binder across specification systems.

Choosing a Bitumen Grade by Climate

How pavement temperature, traffic and climate point to 40/50, 60/70, 80/100 or a modified binder — and why the project specification always has the final word.

Export Documents Explained: COA, SDS, Third-Party Inspection

What each bitumen export document proves, who issues it, and what to check before your container leaves China.

How to Read a Bitumen COA (Certificate of Analysis)

A line-by-line guide to the tests on a bitumen COA: what each value means, how to match the batch to your shipment, and what to do with borderline results.

How a CIF Bitumen Price Is Built — and How to Read the SHFE BU Reference

The components inside a CIF bitumen quotation, and why the SHFE BU futures price shown on this site is a Chinese domestic reference — not an export price.

How to Verify a Chinese Bitumen Exporter Before You Pay

A practical due-diligence checklist for first orders: legal-name consistency, documents, live video verification, inspection, staged payments and red flags.

How to Choose Packing: Drums, Jumbo Bags, Flexitank or Bitutainer

A practical comparison of the four containerised bitumen packings: cost per tonne, site equipment needed, and which buyers each one suits.

Storing Bitumen After Arrival: Drums, Bags and Liquid

Practical yard storage for containerised bitumen after discharge: drums, framed bags, liquid tanks and emulsion — layout, heating discipline, stock rotation and safety.

How Much Bitumen Do You Need? Estimating Quantities for a Road Section

How to estimate binder tonnage for a road section from area, layer thickness and mix design — with a worked example and a conversion to 20ft containers.

Bitumen for Airport Runways, Taxiways and Aprons

What governs binder selection for airfield pavements: heavy aircraft loads, high pavement temperatures, the apron fuel-spillage caveat, documentation and staged supply.

Bitumen Emulsion for Prime and Tack Coats

What prime and tack coats do, how emulsion breaking types differ, typical spray-rate planning ranges, surface preparation, weather limits and storage.