Grade selection starts with a simple idea: bitumen softens as it heats and stiffens as it cools, so the right grade is the one whose hardness band fits the temperatures the pavement will actually see, under the traffic it will actually carry. This guide gives the standard reasoning; your project specification and mix design govern the final choice.

Think pavement temperature, not air temperature

Black pavement in strong sun runs far hotter than the air above it — on a 35°C day the surface can reach temperatures in the high 50s or more. That is why a climate that feels moderate can still demand a hard binder, and why specifications increasingly define grades by pavement temperature range (the logic behind performance grading). When you assess a location, use its hottest-season pavement temperature for the softening check and its coldest for stiffness — even in the tropics, highland sites can see cool nights.

Hot climates and heavy traffic: go harder

For hot tropical and island climates, ports, climbing lanes, intersections and other slow heavy-traffic locations, 40/50 is the common starting point: its hardness resists rutting and shoving where 60/70 would soften too far. Where loads are exceptional or the design demands high elastic recovery, a polymer-modified binder takes over from 40/50 — see the point at which rutting history or specification language mentions modification, and treat that as the signal to price modified material.

General conditions: 60/70

The world's default grade exists for a reason: in temperate climates with ordinary traffic, 60/70 balances workability, durability and cost, and it is the grade most plants and crews are set up for. Most general road building in mild to warm conditions, without extreme loads, sits here — which is also why it is the most widely stocked and traded grade.

Cooler and lighter duty: 80/100

For cooler highland climates, lower-traffic roads, and surface dressing work, the softer 80/100 gives easier coating and compaction and better low-temperature flexibility. The trade-off is tenderness in heat: do not let a cool-climate choice drift into a hot lowland section of the same project without checking.

Rain, humidity and storage

Climate affects more than grade. Wet seasons compress paving windows and demand dry aggregate and disciplined storage — keep solid bitumen under cover where possible and protect liquid stock from water contamination, which causes foaming when heated. Emulsion work is the most weather-sensitive of all: rain before breaking can wash a fresh prime or tack coat away, so programme emulsion applications against the forecast, not just the calendar.

When in doubt, send us the project specification's binder clause and the site location. We will confirm which of our grades matches it — and flag it in writing if we think the specified grade and the climate are pulling in different directions.

Need bitumen for your project?

Tell us your grade, packing and destination port — quoted within 24 hours on working days.

Request a Quote WhatsApp Us

More Guides

Bitumen Grades Compared: Pen vs VG vs PG

How penetration grades, viscosity grades (VG) and performance grades (PG) relate — and how to order the right binder across specification systems.

Export Documents Explained: COA, SDS, Third-Party Inspection

What each bitumen export document proves, who issues it, and what to check before your container leaves China.

How to Read a Bitumen COA (Certificate of Analysis)

A line-by-line guide to the tests on a bitumen COA: what each value means, how to match the batch to your shipment, and what to do with borderline results.

How a CIF Bitumen Price Is Built — and How to Read the SHFE BU Reference

The components inside a CIF bitumen quotation, and why the SHFE BU futures price shown on this site is a Chinese domestic reference — not an export price.

How to Verify a Chinese Bitumen Exporter Before You Pay

A practical due-diligence checklist for first orders: legal-name consistency, documents, live video verification, inspection, staged payments and red flags.

How to Choose Packing: Drums, Jumbo Bags, Flexitank or Bitutainer

A practical comparison of the four containerised bitumen packings: cost per tonne, site equipment needed, and which buyers each one suits.

Storing Bitumen After Arrival: Drums, Bags and Liquid

Practical yard storage for containerised bitumen after discharge: drums, framed bags, liquid tanks and emulsion — layout, heating discipline, stock rotation and safety.

Heating & Melting Guide for Bagged and Drummed Bitumen

Safe, practical guidance for heating drummed and bagged bitumen on site: equipment, temperature discipline and common mistakes to avoid.

How Much Bitumen Do You Need? Estimating Quantities for a Road Section

How to estimate binder tonnage for a road section from area, layer thickness and mix design — with a worked example and a conversion to 20ft containers.

Bitumen for Airport Runways, Taxiways and Aprons

What governs binder selection for airfield pavements: heavy aircraft loads, high pavement temperatures, the apron fuel-spillage caveat, documentation and staged supply.

Bitumen Emulsion for Prime and Tack Coats

What prime and tack coats do, how emulsion breaking types differ, typical spray-rate planning ranges, surface preparation, weather limits and storage.